Complete Engine Assembly Line and Crankshaft Manufacturing Machines From General Motors
|
|
|
Complete Engine Assembly Line
Block loading. Dual overhead runway,1000lb. Crankshaft loading, 100lb runway Main bearing cap assembly & turning. ABB 2 head nutrunner. Turntable Manual piston insert with block rotation Tighten conrod bolts,apply RTV,check TTT Press rear seal, measure balance shaft driving gear Install balance shaft shim, install shaft.500lb Counterbalance nutrunner Install oil pump, oil suction pipe. Counterbalanced 6 spindle nutrunner. Apply oil pan liquid gasket. 6 axis robot Install oil pan,tighten bolts.6 spindle counterbalanced nutrunner Turntable GEC Fanuc/ ABB Flexible Automation 5 section Control Panel (Half line) Omplicity Control V22 software. Bosch tightening control system Turn Engine. Install Oil Filter & Crank Sensor. Block turner Short Block leak test.Uson 4000 control system Install Cylinder head assembly Tighten Cyl. Head bolts,stamp engine ID. Head rundown tension unit, 10 spindle nutrunner Idle station Install exhaust camshaft & cramshaft cover.hand oil seal inserter,2 hand nutrunners Install Water pump,EGR valve bracket,& coil.Hand nutrunner Long Block leak test.Uson 4000 control system ABB Zone 2 Nutrunner 5 section control cabinet (Half line)ABB Idle station InstallInstall Oil cooler,intake manifoldassembley.1 hand nutrunner Install rear cover,cam sprocket,crank gear,1 hand & 1 nutrunner with jig Install Timing belt & flywheel.2 spindle nutrunner Turntable Install wiring harness & clutch. 3 spindle nutrunner Adjust belt tensioner,pre tighten tensioner,fill engine oil Torque tester Idle station Cold run test Install exhaust manifold,heat shield& front cover.2 hand nutrunners Turntable Install Engine lifter,generator bracket,apply engine ID Pallet Transfer car to station 10, with light guards 3 section Control Panel (Main line) Cylinder Head Sub assembly Line Install fuel rail, MAP sensor Intake manifold leak test Press valve seals, install valves, 18 spindle nutrunner with auto valve key feeder Cyl. head leak test Assemble HLA, Intake camshaft assembly Stud bolt & spark plus assembley
|
|
|
|
 |
|
|
|
|
|
 |
|
|
|
|
|
 |
|
|
|
|
|
 |
|
|
|
|
|
 |
|
|
|
|
|
 |
|
|
|
|
Late Model CNC Machining Centres Used For Crankshaft Manufacturing
• Makino J55-A12B CNC Horizontal Spindle Machining Centre (2001) • Landis Gardner 3L CNC Crankshaft Grinding Machine (2001) • Boehringer VDF 250CM CNC Turret Lathe (2001) • ITW Balance Engineering CRH-317 Crankshaft Balancing Machine (2001) • Adcole Crankshaft Gauging Unit (2001) • Nagel SVS8-50S Cylinder & Crank Bore Honing Machine (2001) • Grob BZ500 CNC Horizontal Spindle Machining Centre (1998) • LK G90-C Coordinate Measuring Machine (2001) • GSA-Fanuc System R-420i Crankshaft Oil Way Robot Deburring Station (2001) • Cleaning Units, Leak Testers and many other more!
|
|
|
|
 |
|
 |
|
 |
|
|
|
|
|
 |
|
|
|
|
 |
|
 |
|
|
|
|
|
|
|
|